SD-eRouter Provisioning
Provisioning
During provisioning, the SD-eRouter is provisioned with network information required to communicate and create the necessary control of data sessions. Provisioning is completed through Adaptiv | Cloud Portal before the device is physically set up and connected to the Internet links. If all the site-provided underlay links have static IP addresses, we recommend completing the provisioning process before the device is shipped out.
To pre-configure a device, login to the Portal and follow the steps below.
- Navigate to the Order Management tab and locate the order in the Order Management table.
- Open the order from the table and
- For Submitted orders, review order details, and click Configure at the bottom of the page.
- For Open orders, first, submit the order and then continue with provisioning.
- For Submitted orders, review order details, and click Configure at the bottom of the page.
- On the Configuration page, fill out the following information and click Next.
If knowledge of the MAC Address or Serial Number is known and provided during the order entry, click Load CPE identification from order info to auto-populate these fields.- POP – Adaptiv | Gateway closest to the installation site
Gateway ATL (Atlanta) DEN (Denver) DFW (Dallas Fort Worth) JFK (New York) LAX (Los Angeles) ORD (Chicago) SEA (Seattle) YTO (Toronto) AUK (United Kingdom) ADE (Germany) - Concentrator pair – Pairs of Concentrators compatible with the selected Gateway
- CIDR – Subnet mask for the number of required IP addresses.
The available value is /32 (automatically selected by the Portal). - Prefix – Prefix compatible with the Gateway
- OS Version – Select 7.1.0 or the latest
- MAC Address – Enter the MAC Address for the Edge device
- Serial Number – Enter the serial number located on the back of the Edge device.

The Portal throws a validation error if the MAC Address for this device is already in use. To proceed with the installation, the users must either deprovision the device from an open or complete order or provide a new MAC address or serial number to use.
- POP – Adaptiv | Gateway closest to the installation site
- On the Confirm Details page, verify the device and network information and select the checkbox - Please confirm all the information is correct. After selecting the checkbox, click Install.

If you note that any information on this page is incorrect, deprovision the device, and reopen the order to continue with the installation. See Order Deprovisioning and Cancelation.
After completing the provisioning, the next step is physically connecting the Edge device to the underlay links. Once the device is online and running, follow the steps listed here to push the configuration through Adaptiv | Cloud Portal.
Connecting SD-eRouter and Internet links
In this step, a network technician or staff at the customer site physically sets up the SD-eRouter by connecting it to the Internet broadband links. The users are recommended to follow the suggested best practices to connect the Edge device to Internet links. To enable a rapid install of the SD-eRouter, follow the step-by-step instructions listed in Adaptiv | Edge E-40 QuickStart Guide.
Installation with Adaptiv | Cloud Portal
This step is completed in Adaptiv | Cloud Portal and the configured network information is pushed to the Edge device.
- Navigate to the Order Management tab and locate the order.
- On the Config & Calibration page, check the Primary CPE Installation Process value.
- Online indicates that the device is online
- Offline indicates that the device is not online or properly connected to the underlay links. Click Refresh CPE Status and check if the status changes to Online.
If the device fails to come online, contact Support Engineers.
- To push the configuration to the device, click Run all.
The system takes around 5-10 minutes to complete the configuration. - After the Edge device has been successfully provisioned, click Next.
- On the Config & Calibration page, Click Save Configuration and Finish.
- Upon successful installation, the Portal displays the message "Save Configuration success. Installation complete."
TERMS OF USE | ANTI SPAM | PRIVACY POLICY | USER LICENSE AGREEMENT | PATENTS